Value engineering is a crucial part of the design process that increases the efficiency of a project. Through value engineering, the A/E team can reduce the cost of construction while increasing and enhancing the scope of design.

Our team prepares a conceptual stage estimate which serves as a basis for a graphic cost model. We "brainstorm" the recommendations which are based on lowering the cost, substituting a better product at the same cost or revising the layout/area of the project. We develop "mini" estimates which exemplify the original design, proposed design and the savings or additional cost associated with a certain proposal.


back to homepage